G3 & G3.2 HP/IP Rotor, Colombia





Original runout approx. 0.85 mm; replacement route estimated at about six months; in-situ precision thermal straightening completed in about 30 days, with post-repair runout approx. 0.07 mm.
-
Tsingshan N250 Rotor, Indonesia





Rotor bow with abnormal vibration; replacement route approximately six months; in-situ thermal straightening completed in approximately seven days.
-
Batam Island Turbine Blade, Indonesia




Single blade fracture; return-to-factory route approximately two months; on-site measurement, custom blade manufacture and field replacement completed in approximately 15 days.
-
Qujing Power Plant LP Rotor Blade, China





Blade-root looseness; return-to-factory route approximately three months; in-situ disassembly, locking-component replacement and NDT, with return to service in approximately 15 days.