• G3 & G3.2 HP/IP Rotor, Colombia

    Original runout approx. 0.85 mm; replacement route estimated at about six months; in-situ precision thermal straightening completed in about 30 days, with post-repair runout approx. 0.07 mm.


  • Tsingshan N250 Rotor, Indonesia

    Rotor bow with abnormal vibration; replacement route approximately six months; in-situ thermal straightening completed in approximately seven days.


  • Batam Island Turbine Blade, Indonesia

    Single blade fracture; return-to-factory route approximately two months; on-site measurement, custom blade manufacture and field replacement completed in approximately 15 days.


  • Qujing Power Plant LP Rotor Blade, China

    Blade-root looseness; return-to-factory route approximately three months; in-situ disassembly, locking-component replacement and NDT, with return to service in approximately 15 days.